Pick your frame gas turbine (B/E, F or HA class), enter fired hours and the last inspection performed, and get the next two maintenance outages with scope of work and parts to plan for.
Planning estimate only. Baseline intervals are for current production hardware burning natural gas at base load without water or steam injection; the maintenance factors here shorten them for fuel, peak firing, fast starts and trips. Water and steam injection, load steps, syngas and legacy annular/silo units are not modeled. Confirm every interval and scope against your unit-specific O&M manual, service letters and OEM service representative before committing to an outage.
Source: Heavy-Duty Gas Turbine Operating and Maintenance Considerations, Rev. P (2021): Fig. 3, 10, 13, 19, 36, 39–42, inspection scopes and Appendix D.